Track panel laying method

SKU S2PV Categories ,
  • The S2PV gives you an efficient track laying methodology to achieve a high output 200 meters per hour  laying 36m long plain track panels
  • Compatibility with other track laying method (type PEM LEM & SPAC) and the ability to work in any type of networks makes the S2PV a must have for quick and efficient installation of track
  • The S2PV ensures a safe work environment with a user friendly remote control

Tekniske Data

Telescopic handling gantries - PEM XL
Engine(s)Diesel / 13 kW
Lifting force20,000 daN (20 tons)
Lifting stroke2,935 mm
Slewing stroke1,375 mm
Maximum feet opening4,973 mm
Remote controlledYes
Mass≈ 4,750 kg
Motorized lifting trolley - LEM 460
Engine(s)Diesel / 21 kW
Lifting force20,000 daN (20 tons)
Lifting stroke350 mm
Table slewing stroke± 400 mm
Remote controlledYes
Mass≈ 4,300 kg

Technical details are for information only

Tilbehør

Options
Sole
Extended Clamp
Feet extension
Clamps top rail

Technical details are for information only

Produkt Forespørsel